Fire Sprinkler System
Fire Pumps
Fire Hose and Standpipe Systems
Commercial Kitchen Hood System
Other Fire Protection Systems (Dry or wet chemical, Gas Systems, Foam, etc)
Projects with the above-mentioned systems should contact the Fire Chief directly at chief@villageofbristol.org or 262-857-2711. A Fire Protection Systems Permit Application will be required, approved, and issued before inspections are completed. Submit completed application to Fire Chief John Niederer. (Link for the application is above)
Note: The Fire Department does not review plans for 1-2 family residential dwellings.
PERMIT APPLICATION NOTICE: Include all WI contractors involved in the project with license number, phone number, and email. Failure to provide required documents for all projects listed below will delay approval process. APPLICATIONS WILL NOT BE REVIEWED WITHOUT ALL REQUIRED FORMS.
For all building permit inquiries and form submissions, contact Jeana Peterson at office@villageofbristol.org.
- ONLINE PERMIT (see below)
- Wisconsin licensed contractors - include license #, phone #, and email address. *Must include BOTH electrician AND master electrician for ANY electrical work.
- Zoning permit (printable form accessible with link below - NOT REQUIRED FOR SHEDS LESS THAN 150 SQUARE FEET)
- Plat of survey showing where project will be built
- 1 set of plans
- Neighborhood Association approval, if applicable.
Air Conditioner / Dishwasher / Electric / Furnace / Generator / Plumbing / Radon / Raze / ** Remodels / Roof / Siding / Water Heater / Water Softener: the following documents are required.ONLINE PERMIT (see below)
- Wisconsin licensed contractors - include license #, phone #, and email address. *Must include BOTH electrician AND master electrician for ANY electrical permits.
- ** 1 set of plans are required for REMODELS
Fence: the following documents are required.
- ONLINE PERMIT (see below)
- Wisconsin licensed contractors - include license #, phone #, and email address.
- Zoning permit (printable form accessible with link below)
- Survey showing placement of fence
- Neighborhood Association approval, if applicable.
New Construction/Additions: the following documents are required. (if applicable)
- ONLINE PERMIT (see below)
- Wisconsin licensed contractors - include license #, phone #, and email address. *Must include BOTH electrician AND master electrician for ANY electrical permits.
- Zoning permit (printable form accessible with link below)
- Plat of survey
- Erosion control
- 2 sets of plans
- Sanitary permit - if private (holding tank or mound system) - Issued by Kenosha County
- Heat calculations
Section Tools
Hello
What is a Passkey?
Imagine signing into your account as easily as unlocking your phone—no more worrying about remembering or typing a password. A passkey is a secure digital key that uses the safety features in your device to keep your account protected. It’s designed to be both simple to use and highly secure.
Ready to experience a simpler, safer sign-in? Click the button above to create your passkey now.